Stormwater management is a crucial yet often underestimated aspect of urban development, particularly in areas prone to heavy rainfall or flooding. These challenges can be significant for developers, impacting both costs and project timelines. This was the challenge faced in Fort Myers, Florida, when an unexpected design conflict with the original stormwater structure threatened to derail the entire project. Read the full case study to learn how the team was able to save money and avoid a potential six-month or longer construction delay.