tag >> revit
-
Bringing BIM to Warrior Canine Connection
May 16th, 2016
A measurement process, which would normally take weeks using hand, paper, and a measuring tape was completed in less than 3 days; the team was able to scan the existing structures and offer accurate, down to the millimeter smart digital measurements of the facilities – the first ever as-is blueprint of these barns.